Launching Triton XLR-07 Fitted with Pipeline Survey Skid

2022 – Pipe Line Survey

Summary:

600km Pipe Line Survey

Client:

PTT Pcl

Project:

3-Year Pipe Line Inspection Program

Location:

Multiple Fields, Gulf of Thailand

Main Assets Deployed:

OSV “Beacon Altair” – Triton XLR Work Class and SeaEye Lynx Inspection Class ROV Systems

Scope of Work

3- Year contract for annual inspection of gas pipe lines using WROV fitted with pipe line inspection skid

OSV Beacon Altair Setting Up

OSV “Beacon Altair” Setting Up

Random WROV Footage

Random WROV Footage