2022 – Seabed Survey & Debris Removal

Launching SeaEye Leopard WROV

2022 – Seabed Survey & Debris Removal

Summary:

Seabed Survey & Debris Removal

Client:

T7 / Petronas

Project:

Hydrographic seabed survey and removal of found debris prior to MOPU arrival

Location:

Sarawak, Malaysia

Main Assets Deployed:

OSV “Crest Hydra” – SeaEye Leopard WROV System

Scope of Work

Hydrographic seabed survey and removal of found debris using SeaEye Leopard WROV System prior to MOPU arrival

 

WROV Control

Deck Operations

 

2022 – Marine Growth Cleaning

Monitoring of Cleaning Process

2022 – Marine Growth Cleaning

Summary:

Removal of marine growth prior to decommissioning of offshore installations

Client:

Chevron

Project:

Marine Growth Cleaning to reduce weight prior to decommissioning and removal of 30+ offshore jackets

Location:

Gulf of Thailand

Main Assets Deployed:

OSV “Crest Hydra” – Triton XLX 50 and SeaEye Leopard WROV Systems – 15,000psi DynaJet and HPWJ Systems

Scope of Work

Reduction of excess weight from offshore jackets prior to decommissioning and final removal of the structures, by removing marine growth using WROV controlled DynaJet and HPWJ systems

 

Stand-Off Footage of Cleaning Process

Close-Up Footage of Cleaning Process

 

2022 – UWILD of Floating LNG Terminal

OSV “Crest Hydra” Night Time Approach

2022 – UWILD of Floating LNG Terminal

Summary:

UWILD and General Subsea Maintenance of Floating LNG Terminal

Client:

Excelerate Energy

Project:

Annual UWILD of Hull, PLEM and Mooring System

Location:

Bangladesh

Main Assets Deployed:

OSV “Crest Hydra” – Air DIVE System “AS03”

Scope of Work

Diver inspection and cleaning of subsea mooring lines, inspection and cleaning of Flexible Riser systems, subsea flange repairs and valve operations, inspection and cleaning of PLEM including CP survey, investigation and repair of potential hydraulic leak

 

Diving LARS Systems Preparation

Night Time Dive

 

2022 – Pipe Line Survey

Launching Triton XLR-07 Fitted with Pipeline Survey Skid

2022 – Pipe Line Survey

Summary:

600km Pipe Line Survey

Client:

PTT Pcl

Project:

3-Year Pipe Line Inspection Program

Location:

Multiple Fields, Gulf of Thailand

Main Assets Deployed:

OSV “Beacon Altair” – Triton XLR Work Class and SeaEye Lynx Inspection Class ROV Systems

Scope of Work

3- Year contract for annual inspection of gas pipe lines using WROV fitted with pipe line inspection skid

 

OSV “Beacon Altair” Setting Up

Random WROV Footage

 

2022 – Wellhead Removal

Mobilization of OSV “Grand Canyon II” in Sattahip

2022 – Wellhead Removal

Summary:

Removal of 87 Wellheads by Internal Cutting 

Client:

Chevron

Project:

Multi-Year Program of Wellhead Decommissioning

Location:

Multiple Fields, Gulf of Thailand

Main Assets Deployed:

OSV “Grand Canyon II” – 2 x Schilling UHD WROV Systems – Abrasive Multi String Cutter (MSC) – Multi Well Retrieval Tool (MWRT) – Inversion Table & Rack System

Scope of Work

300 day contract for subsea wellhead abandonment and decommissioning services including the provision of Offshore Support Vessel (OSV) services, UHD type WROV Systems with qualified ROV personnel for performing inspection work, well abandonment related activities, subsea wellhead decommissioning, light construction work, cement squeeze and other related decommissioning services.

 

Wellhead in laydown frame

Wellhead being lowered to deck

Deck handling of recovered and cleaned wellheads

 

2022 – Downhole Logging

LTSDS Tower Deployment

2022 – Downhole Logging

Summary:

Downhole Logging of Plugged Wellheads prior to Removal

Client:

Chevron

Project:

Multi-Year Program of Wellhead Decommissioning

Location:

Multiple Fields, Gulf of Thailand

Main Assets Deployed:

OSV “Beacon Altair” – Triton XLR Work Class and SeaEye Lynx Inspection Class ROV Systems – LTSDS (Logging Tower Subsea Deployment System)

Scope of Work

Pre-removal survey and recording of internal wellhead condition for integrity of plugs and condition of casing and annulus, using Camera Tool String, MTD (Magnetic Thickness Detector, and MPNNS (Memory Pulsed Neutron-Neutron System) launched from a Beacon Offshore developed LTSDS (Logging Tower Subsea Deployment System) providing a fixed and weather independent launching point for the inspection spread. 

The LTSDS features: 

  • Turret design and stable base
  • Deployed by vessel crane and rigging released by WROV
  • Smart hub drive system with speed control, tension and line-out meter
  • Powered by control umbilical or directly from WROV
  • Approximate in-water weight 1.8 ton

 

Downhole Cleaning Operation

Downhole Cutting Operation

 

2016 – Bracing Installation

Bracing Installation by Diver

2016 – Bracing Installation

Summary:
Diver installation of 3 x cross bracings on tripod jacket in Gulf of Thailand

Client:
Undisclosed

Project:
Cross Bracing Installation

Location:
Thailand

Main Assets Deployed:
Modular AIR Dive System “AS-02” with Double LARS and supporting equipment

Scope of Work
Installation by divers of three (3) pre-fabricated cross bracings to strengthen a tripod jacket. The modular AIR dive system was mobilized to client’s accommodation barge together with a 9-man dive team. Beacon Offshore provided quality control of bracing construction together with specialized rigging and rigging procedures. The bracings were installed on time and within budget.

Manufacturing Quality Control

Site Survey

 

2018 – Anode Installation

Triton XLR WROV Fitted with Anode Retro Clamp

2018 – Anode Installation

Summary:
Retrofit installation of anodes on platform and 200 km pipeline in Gulf of Thailand

Client:
EMAS

Project:
2018 Anode Retrofit Program.

Location:
Erawan Field to Khanom Landfall, Thailand

Main Assets Deployed:
OSV “Crest Hydra” – Triton XLR Work Class ROV System

Scope of Work
Installation of retro-fit anode sleds onto Riser Platform and associated subsea natural gas pipeline. Beacon Offshore provided DPII vessel and ROV support for the installation of anodes on the platform and on approx. 200km of pipeline. The design, manufacture and delivery of the anode material and clamping system were provided by other contractors, as were the survey positioning services.

Anode Pod Being Lowered Into position

Aerial Photo of OSV “Crest Hydra”

 

2020 – Chevron Platform and Pipeline …

WROV Control

2020 – Chevron Platform and Pipeline IRM Program

Summary:
Chevron 2020 Inspection, Repair & Maintenance program for field installations in Gulf of Thailand

Client:
Chevron

Project:
2020 Platform and Pipeline IRM Program

Location:
Multiple Fields, Thailand

Main Assets Deployed:
OSV “Beacon Altair” – Triton XLR Work Class ROV – SeaEye Cougar Light Work Class ROV

Scope of Work
Full scope IRM program on multiple pipelines, platforms and wellheads including general visual inspection (GVI), detailed visual inspection (DVI), flooded member detection (FMD), anode survey, CP measurement, marine growth survey, debris removal, subsea valve operations, high pressure water jet cleaning and gas collection.

Field Complex

Triton XLR Fitted for FMD program

 

2017 – PTTEP ACFM Inspection Program

OSV “Endeavour” with Daughter Craft “Beacon 2”

2017 – PTTEP ACFM Inspection Program

Summary:
Underwater node weld inspection campaign for GBN Jacket Lift Extension

Client:
PTTEP

Project:
ACFM Node Weld Inspection – GBN Jacket Life Extension

Location:
Greater Bongkot North Field, Thailand

Main Assets Deployed:
OSV “Endeavour” – Daughter Craft “Beacon 2” – Merlin 2000 Work Class ROV

Scope of Work
To conduct underwater node weld inspection campaign to verify weld integrity and re-baseline the platform fatigue life. The general scope included surface preparation and underwater inspection by CVI, ACFM and MPI techniques for 54 nodes on 11 jacket structures. Due to restricted access between jacket structures of the central complex, the AIR diving campaign was conducted mostly from the Daughter Craft “Beacon 2” while the ROV scope was carried out simultaneously from the OSV “Endeavour”

AIR Dive System Launch Area (Merlin ROV Launched to Port)

Diver ACFM Inspection